首页 News 正文

After discovering loose parts during the 737 Max 9 inspection, Boeing requested the supplier to tighten the bolts

我放心你带套猛
229 0 0

On January 24th, it was reported that after multiple airlines reported finding loose components during inspections of grounded 737 MAX 9, Boeing issued a notice to its suppliers last week outlining the practice of ensuring proper tightening of bolts.
This memo dated January 17th shows that Boeing requires suppliers to "must" meet quality requirements, stating that "ensure that work instructions are error proof and continuously monitor quality, especially torque requirements.". Boeing has requested suppliers to record torque requirements in their work instructions and mechanics to record the torque applied when tightening components, and to ensure that tools are properly calibrated to ensure that bolts are properly tightened. (Reuters)
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

我放心你带套猛 注册会员
  • 粉丝

    0

  • 关注

    0

  • 主题

    31