首页 News 正文

Vale's Q3 2024 Results Release

阿豆学长长ov
121 0 0

Sao Paulo, October 25th (Xinhua) -- On the 24th local time, mining giant Vale, headquartered in Rio de Janeiro, Brazil, released its third quarter 2024 results, stating that as of September 30, 2024, Vale's net debt was $16.5 billion, an increase of $1.8 billion compared to the previous quarter, mainly due to an increase in reserves related to the Samaco dam breach.
The iron ore yard at the Madeira Port shipping terminal in the Vale region of Sao Luis, Maranh ã o state, Brazil. Data chart
The report shows that the operational and sales performance of all business departments in Vale has improved. The shipment volume of iron ore increased by 1.3 million tons year-on-year, with a growth rate of 2%; The average actual price of iron ore powder was 90.6 US dollars per ton, a decrease of 7.6 US dollars per ton compared to the previous period, while the reference price of iron ore decreased by 12.0 US dollars per ton during the same period.
Formally adjusted EBITDA (earnings before interest, tax, depreciation, and amortization) was $3.7 billion, a decrease of 6% month on month and 21% year-on-year. The cash cost of iron ore powder C1 (excluding third-party procurement) was $20.6 per ton, a decrease of 17% month on month and 6% year-on-year. In September, the production cost of C1 decreased to $18.2/ton, indicating that good performance is expected in the fourth quarter.
The total costs of copper and nickel are $2851/ton and $18073/ton, respectively. The guidance target for the total cost of copper has been further lowered, currently to $2900/ton to $3300/ton. The total cost guidance target for nickel remains at $15000/ton to $16500/ton and is expected to be achieved.
At the same time, Samarco's related reserves have been revised to $4.7 billion, an increase of $1 billion, reflecting the latest assessment of the potential settlement agreement with the Brazilian government, claims related to Samarco's dam breach, and Samarco's ability to provide funds for future outflows.
Gustavo Pimeta, CEO of Vale, stated that this quarter, Vale's iron ore production reached its highest level in over five years. The production of pellets has reached its highest level since 2019. In terms of basic metal business, the production of copper and nickel has also made steady progress, thanks to operational improvements in Canada and the effectiveness of asset reviews. The next step will continue to ensure the safety of the mining dam. Recently, the Sul Superior mining dam has been removed from the third level emergency response status.
Wen Bida stated that Vale will sign a settlement agreement with the Marianas regarding the Samako dam breach, which will benefit the affected people and society through a final solution that benefits all stakeholders
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

  •   第七届中国国际进口博览会即将到来。作为进博会“全勤生”,此次进博会,强生将以“创新于行,关爱于心”为主题,聚焦医疗科技和创新制药两大业务板块,携百余款创新产品亮相医疗器械及医药保健展区7.2馆,其中 ...
    blueskybb
    昨天 14:16
    支持
    反对
    回复
    收藏
  • 【福特CEO:最近一直开小米SU7】美国福特汽车公司首席执行官(CEO)吉姆法利透露,在过去6个月里他一直开中国小米公司制造的SU7电动汽车,同时也借此思考未来要如何与中国汽车业竞争。他还说,现在已不想再去开原来 ...
    xiaoguaiguai
    昨天 13:15
    支持
    反对
    回复
    收藏
  •   界面新闻记者 | 崔鹏   10月23日凌晨,高通技术公司在骁龙峰会上宣布推出Snapdragon Cockpit Elite(骁龙座舱至尊版)和Snapdragon Ride Elite(Snapdragon Ride至尊版)两款新型车载平台。   高通汽车、行 ...
    871
    3 天前
    支持
    反对
    回复
    收藏
  • 【台积电明年5纳米以下报价或再涨】据业界人士称,台积电为降低海外厂高营运成本及2纳米部署成本所带来的毛利率冲击,近期已向多家客户释出2025年代工报价,根据客户、产品与产能规模不同,5纳米、4纳米、3纳米代工 ...
    小延Air
    昨天 12:38
    支持
    反对
    回复
    收藏
阿豆学长长ov 注册会员
  • 粉丝

    0

  • 关注

    0

  • 主题

    27