首页 News 正文

Vale Q2 Report: Iron Ore Production Reaches Record High for Q2 Since 2018

教们边束千
1283 0 0

On the 25th local time, Vale, a global iron ore giant headquartered in Rio de Janeiro, Brazil, announced its Q2 2024 performance. The report states that iron ore production in the second quarter of 2024 set a record high for the second quarter since 2018.
Data shows that in the second quarter of 2024, the shipment volume of iron ore increased by 5.4 million tons year-on-year and 16 million tons month on month, with growth rates of 7% and 25% respectively. This is due to the highest production volume in the second quarter since 2018 and the completion of inventory sales. The strong shipment volume resulted in a formally adjusted EBITDA (earnings before interest, tax, depreciation, and amortization) of $4 billion.
In the second quarter of 2024, the cash cost of iron ore powder C1 (excluding third-party procurement) was $24.9 per ton, an increase of 6% compared to the previous quarter, mainly due to seasonal inventory turnover and concentrated maintenance and repair activities.
Affected by long-term freight contracts, the freight cost of iron ore powder decreased by 0.3 US dollars/ton month on month, reaching 19.0 US dollars/ton, which is 6.8 US dollars/ton lower than the average freight cost of the Brazil China C3 route.
The total cost of copper and nickel in the second quarter was $3651/ton and $15000/ton, respectively.
Data shows that the company's net revenue for the second quarter was $9.92 billion, a 3% increase from the same period last year, which was $9.673 billion. Analysts expect it to be $9.94 billion. The net profit attributable to shareholders was $2.769 billion, a year-on-year increase of 210%, far exceeding analysts' expectations of $1.7 billion.
The adjusted EBITDA was $3.993 billion, which was basically unchanged year-on-year. Net debt was $8.59 billion, a year-on-year decrease of 4%. Capital expenditures amounted to 1.328 billion US dollars, a year-on-year increase of 10%.
Eduardo Bartolomeo, CEO of Vale, stated that in terms of low-carbon emissions reduction, the company is advancing key growth projects such as Grand Valjean and Capanema, which will increase production capacity by 30 million tons over the next 12 months; In terms of energy transition metals, the company has resumed operations in the Sosegu, Onsabuma, and Salobo mining areas. B3/B4 mining dams will be dismantled and are expected to complete 53% of the upstream dam de characterization plan by the end of this year. (End)
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

  • 【哔哩哔哩季度首次实现盈利 公司股价为何反跌超13%?】今日哔哩哔哩-W(09626.HK)公布三季业绩,季度首次实现盈利。股价却出现大跌,盘中一度跌超13%。截至发稿,跌10.59%,报145.20港元。 ...
    7p狼
    3 天前
    支持
    反对
    回复
    收藏
  • 阿里巴巴公告,第二财季云智能集团收入为人民币296.10亿元(42.19亿美元),同比增长7%。
    sn222663
    前天 12:56
    支持
    反对
    回复
    收藏
  •   【大河财立方记者陈薇】双11收官之后,11月15日,阿里巴巴集团发布2025财年第二季度(截至2024年9月30日季度)财报,本季度公司收入2365.03亿元,同比增长5%,净利润435.47亿元,同比增长63%。   虽然增长只 ...
    sn222663
    前天 13:14
    支持
    反对
    回复
    收藏
  •   达拉斯消息:美国西南航空一架客机当地时间15日晚在得克萨斯州达拉斯市拉夫菲尔德机场停机坪上被子弹击中,幸无人受伤。   路透社援引西南航空公司发言人的话称,涉事的是该公司航班号为2494的客机,一颗子弹 ...
    sherlock1985
    前天 20:17
    支持
    反对
    回复
    收藏
教们边束千 新手上路
  • 粉丝

    0

  • 关注

    0

  • 主题

    3